This building project is sold out.

G+P Wasserstadt Spindlersfeld 3 GmbH & Co KG

SPREEQUARTIER SPINDLERSFELD

126 new build condominiums

Project details

  • Carl-Spindler-Straße 12, 12555 Berlin / Köpenick
  • Condominium
  • On request
  • 1 - 3 rooms
  • 32.69 - 128.82 m2
  • End 2024
  • 21
  • Upscale
  • 23738

Location

Project description

Image new build property SPREEQUARTIER SPINDLERSFELD Berlin / Köpenick

FROM LAUNDRY TO HOUSING -
SPREEQUARTIER KÖPENICK

Spindlersfeld is in the Köpenick district of the Treptow-Köpenick district. It lies on the left bank of the Spree. In 1873, the Brandenburg provincial government officially confirmed the name "Spindlersfeld" for the area of ​​the chemical cleaning, laundry and dye works founded by the entrepreneur Wilhelm Spindler in 1871.

In addition to the large laundry, W. Spindler also built a workers' settlement with inexpensive apartments in which up to 50 workers' families lived in the immediate vicinity of the factory. Today the so-called "Spindler buildings" are under monument protection and are being extensively renovated.

An area for all lifestyles
A total of around 380 apartments will be built on the approx. 24,300 m² property, divided into several building areas.

The Spindlersfeld district on the Spree is characterized by the fact that there is something for every apartment requirement, whether to own or rent: from micro apartments, studios with 1 bedroom, apartments with 2 bedrooms to penthouses of approx. 128 m².

With the use of a red facade stone, the architecture will be based on the monumental quality of the inner ring building. In the first step, we carried out the public and private development of the entire area. The completion of the infrastructural measures such as KITA and public playground took place in summer 2020.

Image new build property SPREEQUARTIER SPINDLERSFELD Berlin / Köpenick

Outfitting

FLOORS
The floor covering in the kitchen and living rooms is oak look (3-layer parquet or vinyl). The sanitary areas and the utility rooms are equipped with tiles.

BATHROOMS/SHOWERS/WC'S
The bathrooms will be equipped with toilets, washbasin and shower. The hot/cold water is regulated via single-lever mixer taps. Duravit brands are used for all sanitary installations. Washbasins and toilets from the Philippe Starck 3 series. Hot and cold water meters are installed to limit costs. Interior bathrooms and toilets have mechanical ventilation.

TILES
30x60cm tiles are laid in the bathrooms and guest toilets.

WINDOWS /BLINDS
Plastic windows with insulating glazing are installed in accordance with soundproofing requirements and proof of thermal insulation. Make Schüco or equivalent. External venetian blinds in anthracite are attached for shading.

DOORS
Almost all doors are 2.13 m high with stainless steel or aluminum fittings “Hoppe Amsterdam” or equivalent.

HEATING
Underfloor heating is installed throughout the living area. The temperature is conveniently controlled using room thermostats.

KITCHEN
The kitchens are part of the open-plan concept and are integrated into the living-dining area. Kitchens are not provided on site.

ELECTROINSTALLATION
All rooms are equipped with a sufficient number of switches and sockets (Schneider, Elso Joy white or equivalent). All apartments are connected to a central doorbell intercom system with a video eye.

PARKING SPACES
Each interior parking space has an 11-KW charging station.

Image new build property SPREEQUARTIER SPINDLERSFELD Berlin / Köpenick

BUILDING FIELD PARKSIDE II

6 apartment buildings,
126 apartments

The location of the buildings is in the south-eastern part of the planning area, Am Kutscherhaus 1, 3 and Carl-Spindler-Str. 12, 14, 16 and 18 and is part of the construction plan 9-22. In it, the former factory site "Spindlersfeld" is being developed as a residential construction site with new buildings and converted, listed existing buildings.

Because of the proximity to the monuments, the external appearance of the buildings will be adapted to the renovated ring building in coordination with the monument authority.

In the WA13/PARKSIDE II construction phase, 6 free-standing, five-storey apartment buildings with 126 apartments, around 50% of which are barrier-free, with a total of 60 parking spaces are being built. In each of the six towers there are 21 apartments from 32 sqm to 128 sqm of living space. All apartments have balconies or terraces.

There are communal playground areas in the outdoor area.

The buildings do not have a basement. Each of the ground floors has approx. 9 parking spaces, a residents' cellar, a bicycle room and a room for baby buggies, as well as 1 house connection room and 1 garbage room.

The entrances to the parking lots are made from the respective side of the street.

The houses are set back from the street, creating a green strip.

Legal notice: the information on the construction project is an editorial contribution by neubau kompass AG. It is for information purposes only and does not constitute an offer in the legal sense. The content offered is published and checked by neubau kompass AG in accordance with § 2 TMG. Information on any commission obligation can be obtained from the provider. All information, in particular on prices, living space, furnishings and readiness for occupancy, is provided without guarantee. Errors excepted.

Provider

G+P Wasserstadt Spindlersfeld 3 GmbH & Co KG

Flottwellstr. 44, 10785 Berlin