BOE Unternehmensgruppe - Niederlassung Innsbruck

ALLEE 116

10 new build condominiums

  • 50% sold

Project details

  • Kranebitter Allee 116, 6020 Innsbruck / Hötting
  • Condominium, Penthouse
  • from €390,000
  • 2 - 3 rooms
  • 44 - 83 m2
  • on request
  • 10
  • Upscale
  • 25621

Features

  • Elevator
  • Balcony
  • Floor-level windows
  • Rooftop terrace
  • Real wood parquet
  • Bicycle room
  • Triple-glazed windows
  • Underfloor heating
  • Large-format tiles
  • Groundwater heatpump
  • Basement room
  • Playground
  • Open-plan kitchen
  • Car parking spaces
  • Private gardens
  • Branded sanitary ware
  • Terrace
  • Underground garage

Location

Further info

The ALLEE 116 residential building project has already been completed and is now ready for occupancy.

Residential units

Request prospectus/price list
*Required field

We treat your data confidentially. By submitting, you agree to the processing of your request in accordance with our privacy policy.

Project description

Image new build property ALLEE 116, Innsbruck

URBAN. GREEN. LIFE.

Sophisticated floor plans, inviting outdoor spaces and high-quality, carefully selected execution make the ALLEE 116 project a particularly desirable residential address.

Here, on Kranebitter Allee, there is a sustainable residential building with modern 2 and 3-room apartments in which you can make your dream home come true.

10 residential units
3 floors
10 underground parking spaces
3 free parking spaces
Children's playground
Image new build property ALLEE 116, Innsbruck

Hello quality, Hello home!

Living in the countryside and yet very close to Innsbruck city center. The residential building project on Kranebitter Allee in Hötting West combines nature and urban flair.

On the one hand, the city center can be easily reached by bike or tram in just 15 minutes, and on the other hand, nature is on your doorstep.

The modern architecture of the small residential complex fits perfectly into the surrounding area, which is characterized by single-family homes. During project development, the BOE paid particular attention to the sustainable energy supply concept.

The pioneering and ecological concept includes a groundwater heat pump that uses the thermal energy of the groundwater. The electricity required for the pump is largely generated by the in-house photovoltaic system, which leads to extremely low heating and hot water costs.

Your own piece of nature
thanks to comfortable outdoor areas
Spacious basement compartment
included in every apartment
Bike room
for all residents
Image new build property ALLEE 116, Innsbruck

The ALLEE 116 residential building project has already been completed and is ready for occupancy.

The ALLEE 116 residential building project was completed in November 2023 and is ready for occupancy.

There are currently still available residential units.

Take advantage of the opportunity to arrange a viewing appointment to see for yourself the quality and explore the two furnished model apartments.

Image new build property ALLEE 116, Innsbruck

Legal notice: the information on the construction project is an editorial contribution by neubau kompass AG. It is for information purposes only and does not constitute an offer in the legal sense. The content offered is published and checked by neubau kompass AG in accordance with § 2 TMG. Information on any commission obligation can be obtained from the provider. All information, in particular on prices, living space, furnishings and readiness for occupancy, is provided without guarantee. Errors excepted.

Provider

BOE Unternehmensgruppe - Niederlassung Innsbruck

Rennweg 7, 6020 Innsbruck